PROJECTS

With a performance and innovation driven approach, Direct Network Solutions has contributed to the implementation of complex projects, providing specialized technical expertise in areas such as Telecommunications, IT&C, Integrated Security Systems, Electrical Measurements and Testing, Automation and SCADA systems.

Our involvement highlights a strong commitment to the technical excellence, operational sustainability, and the development of long-term solid partnerships.

We adapt our solutions to the specific requirements and complexity of each project we engage in, ensuring performance, compliance, and reliability.

Here is a selection of representative projects carried out in collaboration with our partners, where Direct Network Solutions played a key role, aligned with our area of expertise.

Note: Some images displayed in this section are illustrative and are intended to reflect the complexity and specific characteristics of the projects delivered within our area of expertise.

Implemented Solutions. Measurable Results. Real Impact.

  • ALL
  • TELECOMUNICATIONS
  • IT&C
  • INTEGRATED SECURITY SYSTEMS
  • ELECTRICAL TESTS & MEASUREMENTS
  • SCADA SYSTEMS

Oravita Wind Power Plant

Provision of VPN data transmission services, remote and on-site technical support, as well as IT and Telecommunications services for the 9 MW Oravita Wind Power Plant.

IT Services for Slupia, Szydłowo and Orneta Wind Farms

Deployment of IT infrastructure and related engineering services for transformer substations in Szydłowo, Orneta, and Słupia located in Poland.

Lukoil Heating Plant

Lukoil Heating Plant is located in Prahova County.

Green Breeze Wind Farm – 220kV Frumusița Substation

Green Breeze project is a wind farm located in Frumusita, Galati County, including, including V162-6.2 MW onshore wind turbines with an installed capacity of 99.20 MW.

74.375 MW Mosteni 4 Photovoltaic Power Plant + 400 kV Trivalea - Mosteni Electrical Substation

The Mosteni 4 photovoltaic park is located in Trivalea – Mosteni, Teleorman County, and has an installed capacity of 74.375 MW

169 MW Iepuresti Photovoltaic Power Plant + 400 kV Iepuresti Electrical Substation

Iepuresti photovoltaic park, located in Giurgiu County, has an installed capacity of 169 MW.

121.298 MW Calugareni 2 Photovoltaic Power Plant + 220 kV Calugareni Electrical Substation

Grid connection of Calugareni 2 photovoltaic power plant, with an installed capacity of 121.298 MW located in Calugareni, Giurgiu County, to the public electricity network – Connection Installation Operator.

48.59 MW Bolbosi Photovoltaic Power Plant

Located in Gorj County, Bolbosi Photovoltaic Power Plant has an installed capacity of 48.59 MW and is part of Romania’s strategic push toward renewable energy.

4.997 MW Tecrom 1 + 2 Photovoltaic Power Plant

Tecrom 1 + 2 Photovoltaic Power Plant, located in Ialomita County, has an installed capacity of 4.997 MW.

Cobadin Wind Power Plant

Cobadin Wind Power Plant is located in Cobadin, Constanta County, and has an installed capacity of 26 MW.

Corni Wind Power Plant

Corni Wind Power Plant is located in Corni, Galati County, with an installed capacity of 70 MW and including 35 wind turbines.

460 MW Buzau Wind Power Plant + 400 kV Pogoanele Electrical Substation

Buzau Wind Farm, located in Romania, Buzau County, is designed to generate an installed capacity of 460 MW, making it one of the largest wind farms in the country.

Pechea Wind Project

Pechea project is a wind farm located in Romania, Galati County, including 2 V162 6.2 MW onshore wind turbines with an installed capacity of 12.4 MW.

SCADA System Replacement at 50 MW Izvoarele 2 Photovoltaic Power Plant Substation

Izvoarele 2 is a photovoltaic power plant located in Izvoarele, Giurgiu County, with an installed capacity of 50 MW.

9.62 MW Sahateni Photovoltaic Power Plant

Sahateni Photovoltaic Power Plant is located in Sahateni, Buzau County, and has an installed capacity of 9.62 MW.

48.8 MW Borzesti Photovoltaic Power Plant

Borzesti photovoltaic park is located in Onesti, Bacau County, and has an installed capacity of 48.8 MW.

Costinesti & Eforie Nord Water Facility

Rehabilitation of the potable water supply pipeline from Eforie Nord Water Facility to Agigea, rehabilitation of the potable water supply pipelines from Constanta Sud Water Facility – Lazu – Agigea – Eforie Nord Water Facility.

Ruginoasa Wind Project

Ruginoasa project is a wind farm located in north eastern part of Romania including 10 MW V162 6.2 MW onshore wind turbines in 6.0 MW operating mode

3 MW Axente Sever Photovoltaic Power Plant

3 MW Axente Sever Photovoltaic Power Plant is located in Sibiu County and has an installed capacity of 3 MW.

7.44 MW Baba Ana Photovoltaic Power Plant

Baba Ana is a photovoltaic power plant located in Baba Ana, Prahova County, with an installed capacity of 7.44 MW.

22.96 MW Vest-Energo Cogeneration Power Plant

22.96 MW Vest-Energo Cogeneration Power Plant is located in District 6, Bucharest, and consists of 6 cogeneration units with an installed capacity of 22.96 MW.

Cernavoda 1 +2 Wind Power Plant

Cernavoda 1 + 2 Wind Power Plant is located in Cernavoda, Constanta County, and has an installed capacity of 138 MW.

Facaeni Wind Power Plant

Facaeni Wind Power Plant is located in Facaeni, Ialomita County, and has an installed capacity of 132 MW.

Babadag Photovoltaic Power Plant

Babadag Photovoltaic Power Plant is located in Babadag, Tulcea County, with an installed capacity of 4.5 MW.

Sarichioi Wind Power Plant

Sarichioi Wind Power Plant is located in Sarichioi, Tulcea county and has an installed capacity of 33 MW.

Vifor Wind Project

The project includes 30 V162-6.2 MW turbines of the EnVentus platform running in a 6.4 MW operating mode and having an installed capacity of 192 MW.

Sacele Wind Project

Sacele project is a wind farm located in Sacele, Constanta County, including 3 x V150-4.0MW and 9 x V150-4.2MW onshore wind turbines with an installed capacity of 50 MW.

Green Breeze Wind Project

Pechea project is a wind farm located in Romania, Galati County, including 2 V162 6.2 MW onshore wind turbines with an installed capacity of 12.4 MW.